Shanghai Gaotian Pump Co., Ltd
Home>Products>WQ type new submersible sewage pump
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
  • Address
    No. 178 Linsheng Road, Industrial South Zone, Tinglin Town, Jinshan District, Shanghai
Contact Now
WQ type new submersible sewage pump
Product Name: QW Non clogging Submersible Sewage Pump Model: 40QW12-15-1.5 Product Category: Sewage Pump Series → QW Non clogging Submersible Sewage P
Product details
Non clogging submersible sewage pump


1、 Applicable places

The discharge of sewage from hospitals and hotels, the discharge of severely polluted wastewater from market engineering construction sites, factories and commercial areas, sewage discharge stations in residential areas, urban sewage treatment plant drainage systems, domestic sewage, urban sewage treatment plant drainage systems, civil air defense system drainage stations, water supply from water plants, and irrigation of farmland.


2、 Product Overview:

1. Adopting a large channel anti clogging hydraulic component design greatly improves the ability of pollutants to pass through, effectively passing through 5 times the fiber material of the pump diameter and solid particles with a diameter of about 50% of the pump diameter.
2. Reasonable design, reasonable matching motor, high efficiency, significant energy-saving effect.
3. The mechanical seal adopts a dual channel series seal, made of hard and wear-resistant tungsten carbide, which has the characteristics of durability and wear resistance, and can ensure the safe and continuous operation of the pump for more than 800 hours.
4. The pump structure is compact, small in size, easy to move, and easy to install, without the need to build a pump room. It can work underwater, greatly reducing project costs.
5. There is an oil-water probe installed in the pump oil chamber. When the mechanical seal on the pump side is damaged and water enters the oil chamber, the probe generates a signal to protect the pump.
6. A fully automatic safety protection control cabinet can be equipped according to user needs to monitor pump leakage, electric leakage, overload, and overheating, ensuring reliable and safe pump operation.

安装示意图

If you have any questions, you can call: 021-57239999 orClick to consult experts for selection and quotation

3、 Type spectrum:

型谱图
structural diagram

无堵塞潜水排污泵结构图

User feedback:



If you have any questions, you can call: 021-57239999 orClick to consult experts for selection and quotation



6、 Installation, operation, and maintenance prompts


It is strictly prohibited to forcefully pull the cable when installing and transporting the electric pump, in order to avoid causing internal cable breakage, joint bonding, etc., which may cause the pump to malfunction or even burn out the motor.


Please use the electric pump cable grounding wire for correct and reliable grounding during installation. When the electric pump is working, it is strictly prohibited for people or animals to approach the working water area or touch the electric pump. In order to reduce electrical risks, it can only be connected to an appropriate grounding socket.


Overloading operation is strictly prohibited


The cable used with the pump must not be less than 1.2 times the cable area of the electric pump.


During installation, the electric pump must be securely fastened, but the cable must not be subjected to force or rotate together with the start and stop of the electric pump.


When the pump fails to discharge water during operation, it should be checked whether the electric pump is reversing or if the air inside the check valve at the outlet of the electric pump has not been completely discharged.


Regularly check the insulation resistance between phases and relative ground of the electric pump motor, which should not be less than 2MQ. Otherwise, it should be disassembled for maintenance.


After six months of normal operation under specified working conditions, the sealing condition of the oil chamber of the electric pump should be checked. If the oil in the oil chamber is emulsified or water precipitates out, the 10 # engine oil and mechanical seals should be replaced in a timely manner.


After one year of normal operation of the electric pump, a major overhaul should be carried out to replace worn and vulnerable parts, check the condition of fasteners, and replenish and replace lubricating grease to ensure good lubrication of the electric pump during operation.


If the electric pump is not in use, please clean it thoroughly and wipe off any water droplets to prevent rusting.

If you have any questions, you can call: 021-57239999 orClick to consult experts for selection and quotation



7、 Troubleshooting analysis

Fault phenomenon

Root cause analysis

exclusion method

Insufficient flow or no water output

1Wrong rotation direction of impeller

2Is the outlet valve open and intact

3There is air in the pipeline between the valve and the pump that has not been discharged, causing the valve to fail to open

4The speed is too low

5Excessive wear of the sealing ring

6The density or viscosity of the liquid being pumped is high

7Pipeline and impeller blockage

1 Simply swap the phase sequence of any two power cords

2 Check the valve

3 Exhaust air from the pipeline

4 Check if the power supply voltage is too low

5 replace

6 Change the density and viscosity of the liquid being pumped

7 Clean up blockages in pipelines and impellers

Unstable operation of electric pump

1Unbalanced impeller

2Bearing damage

3Overload operation

4Installation tilt is not correct

1Replace or perform impeller dynamic balancing

2replace

3Adjust the valve to prevent overload of the electric pump

4reinstall

Low insulation resistance

1Leakage at the terminal of the cable power line

2Cable damage or water ingress from the head

3Mechanical seal wear

4OType seal ring aging and failure

1Tighten the compression nut

2replace

3replace

4replace

excessive current

1Low working voltage

2The impeller is blocked or stuck

3The sealing of the liquid being pumped is relatively large or the viscosity is high

4The valve is too wide open

1Adjust the working voltage

2Clean up blockages in pipelines and liquids

3Change the density and viscosity of the liquid being pumped

4Adjust the valve opening

If you have any questions, you can call: 021-57239999 orClick to consult experts for selection and quotation

8、 Performance parameter table



Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!