Weifang Guihe Waterproof Materials Co., Ltd
Home>Products>Two component polyurethane waterproof coating
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    1395366734513953667345
  • Address
    East of Hanzhuang Village, Taitou Town, Shouguang City, Shandong Province
Contact Now
Two component polyurethane waterproof coating
Two component polyurethane waterproof coating belongs to the category of two-component chemical reaction curing waterproof materials. Component A is a
Product details
Two component polyurethane waterproof coating belongs to the category of two-component chemical reaction curing waterproof materials. Component A is a prepolymer with isocyanate end caps obtained by the condensation of polyether and isocyanate, while component B is a colored liquid composed of plasticizers, curing agents, thickeners, accelerators, and fillers.

Mix the two components A and B evenly in proportion when using the remaining materials, apply them on the surface of the waterproof base layer, and frequently crosslink and solidify at high temperatures to form a rubber like elastic coating, thus playing a waterproof role.

1. The double split polyurethane square water coating is cured into a seamless, complete elastic waterproof layer, which improves the water resistance of construction projects. This is something that cannot be achieved by roll waterproofing, especially since the coating has high elasticity and can prevent cracking or excessive growth in the base layer.
2. It has strong adhesion to the grassroots, such as concrete, wood, metal, ceramics, asbestos tiles, etc. It can also be used as a grid agent
3. Easy to apply, polyurethane coating 2 is a cold applied waterproof coating. During construction, only components A and B need to be mixed in proportion and applied to the waterproof base layer,
4. Easy to repair, only need to repair the damaged phoneme locally, and still achieve the original waterproof effect, saving space and labor costs.
5. Environmentally friendly products with low odor reduce the impact and damage to people and the environment, making them an ideal substitute for tar polyurethane.

Ingredients and Dosage:According to the construction amount, mix the components A and B in proportion and mix evenly before use.The reference dosage is:The dosage for a 1mm thick coating is approximately 13-1.5kgm..
For large-scale waterproofing construction, the mixed coating will be evenly applied with rubber or plastic scraper, requiring a consistent thickness of generally 15m-2.0m. It should be applied in 3-4 layers, and an additional layer of tire reinforcement material should be added to the underground engineering floor. The large coating should be applied vertically after the previous coating has solidified into a film, usually for individual clothing. When multiple layers of waterproofing are used for exposed roof projects, the thickness of each layer should generally be 15mm. The thickness of the toilet and bathroom should not be less than 15mm
Coating thickness:The underground engineering is 1.2-2.0mm. When adding tire reinforcement material between coatings, the thickness of the coating under the tire body should not be less than 12mm. When the waterproof level is one layer of protection for the roof, the waterproof thickness should not be less than 2mm, the degree should not be less than 10mm, and the upper coating should not be less than 0.5mm.
Decoration construction:The right to sprinkle clean on the surface before the last coat of paint solidifies.
Protective layer:The surface of the coating water layer should be isolated and protected according to the design requirements.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!