Equipment Introduction
This production line consists of a drum machine and a spraying machine. The puffed food that has been dried is sent to the drum machine by the elevator. While the drum rotates, the material is added by the spraying machine to spray the surface of the food.
The production line is made of stainless steel, and the variable speed drive motor requires a stable and reliable variable frequency speed regulation and stepless speed regulation system. The heating system is equipped with advanced temperature control and display devices. This production line is well-designed, highly automated, easy to operate, occupies a small area, and saves energy, making it an ideal choice for your investment and factory operation.
The production line occupies an area of:3080 × 2200 × 1850mm.
Main technical parameters of single drum spraying line:
1. Drum machine
Drive power:0.75KWHeating power:21.6KW
Speed regulation method: infinite speed regulationExternal dimensions:4200×1050×1880mm
2. Spray painting machine
Mixing drive power:0.55×2KWSingle screw pump driving power:0.75KW
Heating power:4KW speed regulation method: variable frequency speed regulation
External dimensions:1450×850×1650mm
Installation and debugging
1. Place the equipment in a well ventilated and dry place. Choose a flat and sturdy ground.
2. All equipment should be grounded and placed steadily to prevent uneven stress on various parts of the machine, which may affect the normal operation of the equipment.
3. Connect the sprayed liquid and gas pipeline firmly without any leakage.
maintenance
1. Check if all connecting components are securely fastened, and if there is any looseness, tighten them again.
2. Check for any loose connections in the electrical wiring and ensure the sealing and reliability of the spray coating machine pipeline connections.
1. Clean the drum and spraying machine bucket, inject heating medium water into the interlayer of the spraying machine bucket, and inject materials into the bucket.
2. Open the heating knob of the spraying machine, turn on the mixing motor, start the host controller, check if the speed control system and spraying machine are working properly, check the operation of the equipment for any abnormal sounds.
3. Turn on the heating device of the drum machine, turn on the main motor, and check the operation of the equipment for any abnormal noises.
4. Fix the spray gun onto the drum and prepare for normal production.