brand | Runchuang Environmental Protection | Customized processing | correct |
---|---|---|---|
Processing capacity | 10m³/h | rated voltage | 380v |
rated power | 1.5kw | Diameter of water outlet pipe | 110mm |
Inlet pipe diameter | 110mm |
QinghuangdaoRunchuang Environmental Protection Township Domestic Sewage Treatment Equipment
In terms of environmental risk prevention, eliminate hidden dangers and strengthen emergency response. At present, 565 enterprises have been inspected and rectified in three provinces and one city, with nearly 2000 environmental risk hazards identified and rectified. 187 rectification documents have been issued, and environmental emergency plans for more than 5400 enterprises have been filed.
The effectiveness of governance is evident, which is closely related to the careful deployment, close cooperation, orderly implementation, and division of labor and cooperation of relevant national departments, coastal provinces and cities, and thirteen coastal cities. However, problems that have emerged in the governance process have gradually been exposed. Director Huo pointed out at the press conference that the Bohai Sea is still in the peak period of pollution emissions and environmental risks, with a large amount of land-based and agricultural non-point source pollutants entering the sea, and there is still significant pressure to improve the quality of the marine environment; Some cities still need to address issues such as insufficient attention, relatively slow work, and uneven results between regions.
Later, Director Huo also revealed that the preparation of the "14th Five Year Plan" for national marine ecological environment protection is underway, with the main focus on "effective, efficient, and problem-solving" as the starting point, providing top-level design and systematic planning for marine ecological environment protection in the new era.
Rome wasn't built in a day. The prominent problems in the Bohai Sea stem from accumulation and accumulation. Only by working together, persevering, and persevering can various departments submit a beautiful report card.
QinghuangdaoRunchuang Environmental Protection Township Domestic Sewage Treatment Equipmentproduct overview
The RC-AO integrated sewage treatment equipment adopts the world's biological treatment process, which integrates the removal of BOD5, COD, and NH3-N, and is currently the most efficient sewage treatment equipment. It is widely used in hospitals, blood stations, high-end hotels, villa communities, and residential areas for the treatment of domestic sewage and similar industrial organic sewage. The treated effluent can achieve:
GB 18918-2002 Pollutant Discharge Standards for Urban Sewage Treatment Plants. Field applications have shown that the RC-AO series integrated sewage treatment equipment is a device with excellent treatment efficiency and easy management.
scope of application
The treatment of domestic sewage in residential areas, hospitals, schools, villa communities, hotels, nursing homes, and other places. The treatment of production wastewater from aquatic processing plants, livestock processing plants, fresh milk processing plants, and garbage transfer stations.
Product Features
1. The RC-AO series sewage treatment equipment can be placed above the ground or buried below the surface. The surface can be used as green or square land, so the equipment does not occupy surface area, does not require building, and does not require heating and insulation.
2. The RC-AO series sewage treatment consists of secondary tanks, with the first stage being a reinforced concrete structure with a relatively deep burial depth, and the other group being a steel structure with a relatively shallow burial depth. The steel structure pool adopts the domestic * interpenetrating network anti-corrosion coating for anti-corrosion. It is an interpenetrating polymer formed by the interpenetrating of a rubber network and a plastic network. It is resistant to acid, alkali, salt, gasoline, kerosene, aging, abrasion, and rust. After applying the coating, the anti-corrosion life of the equipment can generally reach more than 30 years.
3. The AO biological treatment process in the RC-AO series sewage treatment equipment adopts a push flow biological contact oxidation tank, which has better treatment than mixed or two-stage series mixed biological contact oxidation tanks. And it has a smaller volume than activated sludge tanks, strong adaptability to water quality, good impact resistance, stable effluent quality, and will not cause sludge expansion. At the same time, a new type of elastic three-dimensional packing material was used in the biological contact oxidation tank, which has a large actual specific surface area and is convenient for microbial biofilm formation and detachment. Under the same organic load conditions, it has a higher removal rate of organic matter than other packing materials and can improve the solubility of oxygen in water.
4. Due to the use of a biological contact oxidation tank in the AO biological treatment process, the volume load of the packing is relatively low, and the microorganisms are in the self oxidation stage, resulting in less sludge production. In addition, the moisture content of the sludge produced by the biological contact oxidation tank is much lower than that of the sludge produced by the activated sludge tank. Therefore, the amount of sludge generated by the RC-AO series sewage treatment equipment is relatively small, and generally only needs to be discharged once every 90 days.
5. The RC-AO series sewage treatment equipment not only adopts conventional blower noise reduction measures (such as vibration isolation pads, mufflers, etc.), but also sets up new sound-absorbing materials on the inner wall of the blower room, so that the noise level during equipment operation is below 50 decibels, reducing the impact on the surrounding environment.
6. The RC-AO series sewage treatment equipment is equipped with soil deodorization facilities. It utilizes reinforced concrete structure to set up improved soil and air distribution pipes in the upper space of the pool body. When the odorous components dissolve in the water contained in the soil through the soil layer, they are then transferred into the soil due to surface adsorption and chemical reactions, and finally decomposed by microorganisms to achieve deodorization.
7. The RC-AO series sewage treatment equipment is equipped with a fully automatic electrical control system, which has good reliability. Therefore, there is no need for dedicated personnel to manage it, only monthly and quarterly maintenance and upkeep are required.
dynamic calculation
Serial Number |
Equipment name |
quantity Actual quantity (units) |
Actual running quantity (units) |
Single unit power (kw) |
Overall operation Power (kw) |
Daily running time (h) |
Power consumption (kWh) |
1 |
aerator |
2 |
1 |
3.0 |
6.0 |
20 |
60 |
2 |
Sewage lift pump |
2 |
1 |
3.0 |
6.0 |
20 |
60 |
3 |
Sludge reflux pump |
2 |
1 |
1.1 |
2.2 |
4 |
4.4 |
amount to |
|
14.2 |
|
124.4 |
Costing
1) Power cost
If the electricity fee is calculated at 0.60 yuan per kilowatt hour, thenE1=124.4 × 0.60=74.64 yuan/d
2) Calculation of operating costs
E=E1=74.64 yuan/d
The sewage treatment capacity is 300 tons/day, equivalent to a sewage treatment cost of 0.2488 yuan/ton of water.
The drug cost is 0.03 yuan per ton, and the total sewage treatment cost per ton is 0.2788 yuan.
Technical Parameter
The removal of organic pollutants and ammonia nitrogen by RC-AO series sewage treatment equipment mainly relies on the AO biological treatment process in the equipment. The working principle is that due to the high concentration of organic matter in sewage, microorganisms are in a state of gas deficiency. At this time, microorganisms are facultative microorganisms, which convert and decompose organic ammonia in sewage into NH3-N. At the same time, they use organic carbon as an electron donor to convert NO-2-N and NO-3-N into N2, and also use some organic carbon sources and NH3-N to synthesize new cellular substances. So the tank not only has a certain function of removing organic matter, reducing the organic load of subsequent aerobic tanks to facilitate nitrification, but also relies on the high concentration of organic matter in the raw water to complete denitrification and ultimately eliminate nitrogen eutrophication pollution. At level O, although the concentration of organic matter has significantly decreased, there is still a certain amount of organic matter and high NH3-N present. In order to further oxidize and decompose organic matter, and ensure smooth nitrification while carbonization is complete, an aerobic biological contact oxidation tank with low organic load is set up at level O. In the O-level pool, aerobic microorganisms and aerobic bacteria (nitrifying bacteria) are mainly present. Aerobic microorganisms decompose organic matter into CO2 and H2O; Autotrophic bacteria (nitrifying bacteria) use inorganic carbon produced by the decomposition of organic matter or CO2 in the air as a nutrient source to convert NH3-N in wastewater into N-2-ON, N-3-ON, and the effluent from O-grade tanks is returned to the * tank, providing electron acceptors for the * tank and ultimately eliminating nitrogen pollution through denitrification.
Equipment installation, debugging, and maintenance
1. Installation: This equipment consists of two sets of tanks, one set is a reinforced concrete structure tank body, and the other set is a steel structure tank body. The reinforced concrete pool body is buried underground, and the steel structure pool body can be buried below the floor or installed on the floor. The civil engineering condition drawings for two sets of pool foundations are provided by our company, and it is required that the excavation width around the perimeter should be at least 600mm larger than the equipment plan size.
2. According to the installation diagram, use a crane to lift the steel structure pool into place. The installation must be carried out under the guidance of our technical personnel, and the position and direction of the box cannot be placed incorrectly. Our company is responsible for the pipeline connection between the pools.
3. After installation, the equipment must be filled with water and tested for leaks at all pipeline interfaces before soil can be filled around and in the gaps of the equipment, and the ground should be leveled. The control lines of the electrical control cabinet should be connected to the equipment, and the electrical control cabinet should be connected to the power lines. Pay attention to the direction of the fan and water pump when wiring.
4. After the installation of the equipment, it is necessary to ensure that there is no water accumulation on the rainy ground, and no heavy objects should be placed above the steel structure pool. Equipment generally does not evacuate internal sewage to prevent groundwater from floating the equipment.
5. Debugging: Our company is responsible for the debugging work. In order to speed up the debugging progress, bacterial strains can be added. To avoid bacterial loss, the water inflow can be reduced and the fan can be started for aeration until a layer of orange yellow biofilm grows on the packing, which is the completion of packing film hanging. Then, the water inflow can be increased to the rated flow rate. After completing the membrane coating of the packing material, the microorganisms in the biological tank are acclimated by gradually reducing the amount of aerator, so that the biological tank is in a state of hypoxia and the microorganisms on the packing material become facultative microorganisms. Then adaptively operate the microorganisms until they meet the design requirements.
6. Equipment maintenance and upkeep: Our company has established a regular maintenance system for AO series sewage treatment equipment for customers, with the main vulnerable component being the water pump. Regularly check the looseness of screws in various parts of the fan and water pump, the tightness of the packing box, the temperature of the bearings, and the quality and amount of lubricating oil to ensure that all parts are normal. At the same time, check the dosage and remaining amount of disinfectant, and adjust the dosage and supplement disinfectant if necessary. The fan and water pump should be maintained and repaired every 5000-8000 hours of operation.
Quality Assurance Commitment
To ensure the quality of the bidding equipment, the following commitments are made:
1. The bidding equipment shall comply with the Chinese Environmental Protection Product Technical Conditions Standards and Enterprise Standards.
2. Strictly follow the contract requirements and provide products that meet design standards and meet quality standards.
3. Strictly inspect and control the incoming quality of raw materials, components, and outsourced parts.
4. We will insure the equipment provided during the manufacturing, transportation, and loading/unloading processes. In the event of an accident, we will promptly replace or repair the equipment free of charge as requested by the purchaser until they are satisfied.
5. If any missing parts or other reasons cause the loss of components during the unpacking process, we are responsible for promptly and free of charge filling the missing parts.
6. Any quality issues that arise during the installation and debugging of the equipment should be addressed first, and then responsibilities should be clarified. If it is our fault, we will bear the responsibility and compensate the demander for any direct economic losses suffered, all based on meeting the requirements of the project schedule.
After sales service commitment
All products sold by our company come with a one-year warranty, lifetime warranty, free design and selection, and free technical consultation.
- Assist customers in selecting suitable matching equipment models.
- Provide technical information related to the equipment and be responsible for guiding installation and debugging.
- Provide information on raw material suppliers.
- Free training for operators and provision of technical consultation.
- Undertake the quality responsibilities stipulated in the Quality Law of the People's Republic of China.
- During the warranty period, if any problems occur under normal use, our company will unconditionally provide unlimited service to customers, and even replace the equipment.
- Product maintenance: Respond within 24 hours after receiving a repair report and promptly dispatch maintenance personnel to the scene to solve the problem.
- Free development of operating procedures for customers and free training of operators.
11、 Electrical control
1. The sewage treatment process adopts two control methods: manual and automatic;
2. The regulating pool sewage pump stops at low water level and starts at high water level;
3. The entire sewage treatment equipment operates fully automatically.
The company has received multiple product awards and has been selected for quality Service Integrity AAA enterprise, national consumer satisfaction brand, quality inspection National standard products, ISO9001-2016 quality system certification, outstanding contribution to promoting the development of green, low-carbon, energy-saving and environmental protection industries Made significant contributions to the sewage treatment issues of enterprises of all sizes across the country.
The company's main business includes medical sewage treatment equipment, domestic sewage treatment equipment, industrial wastewater, washing, breeding, slaughtering, food, printing and dyeing, tourism areas, urban and rural sewage transformation and treatment, and other water treatment equipment processes. It has a small footprint, low investment, and stable effluent standards. Welcome new and old customers to visit and purchase at the factory.
The company adheres to the business philosophy of giving back to nature and nourishing the world, and regardless of the size of the project, we will personally handle every detail. To provide customers with excellent pre-sales, in sales, and after-sales services, and to develop suitable water treatment equipment and equipment plans based on the user's water usage conditions, achieving economic practicality, high quality, and efficiency.
With the release of the "Action Plan for Comprehensive Control of Air Pollution in Autumn and Winter of 2019-2020 in Beijing Tianjin Hebei and Surrounding Areas", the control of air pollution in key areas during autumn and winter has been pushed onto the key agenda of air pollution control. As a key region second only to the Beijing Tianjin Hebei region and its surrounding areas, the autumn and winter air pollution control of the Fenwei Plain has also received much attention.
On April 30, 2019, the Ministry of Ecology and Environment announced the completion status of the environmental air quality targets for the 2018-2019 autumn and winter seasons in key areas. The number of days with heavy pollution in the Fenwei Plain was 250, an increase of 42.9% year-on-year. According to the governance plan for the Beijing Tianjin Hebei region, it can be imagined that the efforts to control pollution in autumn and winter this year will be intensified, and the same will be true for the Fenwei Plain.
Where is the severe air pollution in the Fenwei Plain? It is understood that the Fenwei Plain is the second highest concentration of PM2.5 in China, and also a region with high concentration of sulfur dioxide. At the meeting, Minister of Ecology and Environment Li Ganjie pointed out the "crux" of the problem, which is the concentration of heavy chemical industries in the Fenwei Plain, the energy structure biased towards coal, and the terrain conditions, which are even more unfavorable for the diffusion of pollutants.
Equipment picture: