VIP member
Motorcycle oil pump testing system
Host introduction: This system uses a servo motor shaft to drag the oil pump for empty rotation, and measures the flow rate of the oil pump pressure
Product details
Comprehensive Performance Testing System for Oil Pump
Serial Number
|
physical property
|
subsystem
|
Equipment name
|
technical requirement
|
Specification and model
|
Number
|
notes
|
1
|
machinery
|
Pipeline device
|
1. Fuel tank and pipeline
|
Non standard customization
|
|
1 unit
|
|
2
|
Installation fixtures and platforms for two test oil pumps
|
Non standard customization
|
|
1 set
|
|
||
3
|
electrical
|
Cabinet 1
|
1. Vertical cabinet
|
Can hold 17 inch LCD display, Xunyan industrial control computer, including contactors, electrical switches, wiring, etc
|
VG-34
|
1 unit
|
|
4
|
2 measurement units
|
Variable frequency motor driver
|
1.1kW,5000rpm
|
|
1 unit
|
|
|
5
|
2 Flow measurement instruments
|
Real time display of flow rate in the oil system
|
|
1 unit
|
|
||
6
|
3 Pressure measuring instruments
|
Real time display of import and export oil pressure
|
|
2 units
|
|
||
7
|
4-speed measuring instrument
|
Real time display of oil pump speed
|
|
1 unit
|
|
||
8
|
5 Temperature measuring instrument
|
Control the display of oil temperature, real-time display of temperature in the fuel tank, and adjust the temperature in the fuel tank
|
|
1 set
|
|
||
9
|
6 Pressure transmitter (outlet)
|
(0~0.5)Mpa
|
BTL-900
|
1 piece
|
|
||
10
|
7 Pressure transmitter (imported)
|
(-0.1~0.1)Mpa
|
|
1 piece
|
|
||
11
|
8 Volumetric flowmeter
|
|
DN15
|
1 piece
|
|
||
12
|
3 Information supporting units
|
1 Industrial computer
|
2G memory, 500g hard drive, DVD drive, USB interface, Xunyan
|
IPC-8406
|
1 unit
|
|
|
13
|
2 displays
|
17 inch LCD screen, Dell
|
1 unit
|
|
|||
14
|
Upper computer software
|
Steady state performance test
|
load
|
Test speed, inlet pressure, outlet pressure, pipeline temperature, oil temperature, flow rate
|
VB3.0
|
1 set
|
Including expansion card
|
15
|
Installation materials
|
cable
|
Power cable
|
|
|
1 set
|
|
16
|
Freight and on-site debugging
|
|
|
Once
|
|
Explanation: 1. Wig budget quotation, valid for 3 months.
2. The above list is for routine configuration design. If there are any customization situations or equipment additions or deletions, they can be discussed and agreed upon with Weige.
Online inquiry