Hangzhou Weige Electronic Technology Co., Ltd
Home>Products>Motorcycle oil pump testing system
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    1395802750715968172475
  • Address
    No. 159, Nanshan North Road, Renhe Street, Yuhang District, Hangzhou City
Contact Now
Motorcycle oil pump testing system
Host introduction: This system uses a servo motor shaft to drag the oil pump for empty rotation, and measures the flow rate of the oil pump pressure
Product details
Comprehensive Performance Testing System for Oil Pump
Serial Number
physical property
subsystem
Equipment name
technical requirement
Specification and model
Number
notes
1
machinery
Pipeline device
1. Fuel tank and pipeline
Non standard customization
1 unit
2
Installation fixtures and platforms for two test oil pumps
Non standard customization
1 set
3
electrical
Cabinet 1
1. Vertical cabinet
Can hold 17 inch LCD display, Xunyan industrial control computer, including contactors, electrical switches, wiring, etc
VG-34
1 unit
4
2 measurement units
Variable frequency motor driver
1.1kW,5000rpm
1 unit
5
2 Flow measurement instruments
Real time display of flow rate in the oil system
1 unit
6
3 Pressure measuring instruments
Real time display of import and export oil pressure
2 units
7
4-speed measuring instrument
Real time display of oil pump speed
1 unit
8
5 Temperature measuring instrument
Control the display of oil temperature, real-time display of temperature in the fuel tank, and adjust the temperature in the fuel tank
1 set
9
6 Pressure transmitter (outlet)
(0~0.5)Mpa
BTL-900
1 piece
10
7 Pressure transmitter (imported)
(-0.1~0.1)Mpa
1 piece
11
8 Volumetric flowmeter
DN15
1 piece
12
3 Information supporting units
1 Industrial computer
2G memory, 500g hard drive, DVD drive, USB interface, Xunyan
IPC-8406
1 unit
13
2 displays
17 inch LCD screen, Dell
1 unit
14
Upper computer software
Steady state performance test
load
Test speed, inlet pressure, outlet pressure, pipeline temperature, oil temperature, flow rate
VB3.0
1 set
Including expansion card
15
Installation materials
cable
Power cable
1 set
16
Freight and on-site debugging
Once
Explanation: 1. Wig budget quotation, valid for 3 months.
2. The above list is for routine configuration design. If there are any customization situations or equipment additions or deletions, they can be discussed and agreed upon with Weige.
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!