Yisi Qi (Beijing) Technology Development Co., Ltd
Home>Products>CLB-2000 Stack Test with 150 A/50 V Electronic Load
CLB-2000 Stack Test with 150 A/50 V Electronic Load
The CLB-2000 stack test uses a 150 A/50 V electronic load. The CLB-2000 is a controlled electronic load designed for studying fuel cell and solar cell
Product details

CLB-2000 Stack Test with 150 A/50 V Electronic Load

In a compact chassis, the CLB-2000 combines a potentiostat capable of EIS with a 2kW electronic load. This unit can connect to VMP3 and perform measurements (AC and DC) simultaneously on individual components of the stack (up to 30 component stacks).

CLB-2000 Stack Test with 150 A/50 V Electronic Load

Application:

  • Fuel cell solar cell; Photovoltaic power generation system; Battery stack

CLB-2000 Stack Test with 150 A/50 V Electronic Load

Options:

- SAM-50Voltage adapter (50V) for use with VMP3.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!