Bottled Pure Water Filling Production LineThe washed clean bucket is flipped 90 degrees with the movement of the chain, and the empty bucket is pulled out of the bucket seat by the bucket extraction cylinder and flipped down with the flipping bucket rack. Then, the bucket is flipped up by the bucket pushing cylinder, and the empty bucket is placed on the conveyor belt of the filling machine waiting for filling. After disinfection, the empty bucket reaches the filling position and the filling valve is pushed into the bucket mouth by the cylinder. The filling pump is turned on for filling, and the filling time is set by the PLC. The filling time can be adjusted using the multifunctional buttons on the panel according to the liquid level to achieve the correct position. After the filling is completed, the full barrel is transported by the conveyor belt to the capping station. When passing through the capping station, the bottle cap is automatically placed on the barrel mouth. After the capping is completed, it is output through the conveyor chain and enters the post packaging process.